Single-phase Prepaid KWH Meter

ADL100

  • High Accuracy 0.5S
  • Multi-Tariffs
  • Built-in Relay
  • Switch Control

Feedback

What Do Our Customers Say?

  • “ For over 4 years working with Acrel, they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. "

    Arnold 

    Philippines

  • Cloud Platform for Power IoT is a synchronous integrated solution from energy meter installation to web interactive interface that can see the benefits of features with the first click mouse. Very convenient and fast. I will be with this product for a long time.

    Tuan 

    Vietnam

Highlight

What’s the Function of the Single-phase Prepaid KWH Meter?

Monitor

  • Voltage, Current, Power, Reactive Power, Apparent Power, Power Factor, Kilowatt-hours, Kilovar-hours, etc

Tariff

  • 1~4 kinds of Tariffs
  • Peak, Standard, Off-peak
  • 14 Time period by day

   Auto-Control

  • Built-in Relay
  • Switch Control

Communication

  • RS485, Modbus-Rtu

Specification

What’s the Specification of Acrel ADL series Single-phase Prepaid KWH Meter?

Panel
Specification ADL100 ADL300
Phase Single-phase Three-phase

Parameter

What’s the Parameter of Single-phase Prepaid KWH Meter?

Parameter Description&Value
Measurement kWh&kVarh Total active kWh (bidirectional –positive and negative in total)
Electrical Paratmeters U (Voltage), I (Current), P (Active Power), Q (Reactive Power),S (Apparent Power), PF (Power Factor), F (Frequency)
Function Mode Prepaid Mode Meter will shut down the power once the credit balance is below zero. (Data like credit balance is saved in the meter)
Postpaid Mode Meter won’t shut down the power once credit balance is below zero. (Can remotely control the meter to shut down the power by using Prepaid System)
Mode Change Meter can change the mode between prepaid and postpaid by receiving the command from prepaid system
Control Auto-tripping Control  Auto-tripping control is processed by the built-in high-capacity holding relay of the meters to realized on-off control of circuits breaker, also, this type of control will only be triggerred when meter is in Prepaid Mode
Remote Control Remote control will be command by prepaid system. When users give a command of switch on-off to a certain meter, this command will be send to meters through wireless communication and finally meter will shut down or recover the power after receiving the command. This type of control can be done when meter is in Postpaid Mode
Multi-rate

Multi-Tariff

Optional Function 4 tariff rates (spike, peak, valley, flat); 14 time intervals by day
 Input 

Voltage

Rated Voltage 220~264Vac L-N (Voltage signal input will be also served as power supply for meters)
Frequency 45~65Hz
Input

Current

Rated Current 10(60)A AC (via direct connect)
Starting Current 0.004 Ib
Accuracy Measurement Class 1
Clock ≤0.5s/d
 

Pulse

Pulse Width 80ms±20ms
Pulse Constant 1600imp/kWh
Communication RS485 Interface MODBUS-RTU Protocol
Infrared Used for Meter Reading
HMI LCD Display 8 bits section LCD display
Keypads Programming Setting of communication, current ratio and etc.
Mechanical
Feature
Out-line Dimension
(L*W*H)
72mm*88mm*70mm
Max Wiring Ability (with Flexible Cable) 25mm2

Installation

How to Install the Single-phase Prepaid KWH Meter?

Why choose Acrel?

  • 2003 Established
  • SZ.300286 Listed Company
  • 1200+ People
  • 25000+㎡ Plant
  • Factory Direct-sale

Request Information & Quotation

Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]

If you have more detailed requirements, Please go to the relevant product page to submit the form.

FAQ

Got a Question? Get your Answer

What are the Main Advantages of Acrel?

We have our own Factory and R&D Center

What are the Difference between Acrel and other Brands?

Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer

What Certificates does the Company have?

CNAS, ISO14001, ISO27001, ISO9001

What Certificates do the Products have?

CE, IEC, MID, UL, EAC, ROHS, REACH

How Expensive is Acrel Products?

Competitive Price with High Quality

How long is the product Warranty Period?

2 Years

What is the MOQ?

Purchasing according to your needs, no MOQ limit

How long is the Lead Time?

Sample takes 3 days; Bulk purchase takes 1 month

Small size Dinrail KWH Meter

Certificate:

Feature:
  • Voltage: 220V
  • Current: 10(60)A
  • Size:2P 36mm
  • Communication: RS485
  • Optional Multi-tariff

Six Circuits DC Power Meter without LCD for Telecom Tower

Standard:

IEC61010-1

Certificate:

Feature:
  • Rated -48V DC
  • 6 DC channels
  • Utility Monitor
  • Power for Hall Sensor

Six Channels DC Power Meter with LCD Display for Cell Tower

Standard:

IEC61010-1

Certificate:

Feature:
  • Rated -48V DC
  • 6 DC channels
  • Utility Monitor
  • Power for Hall Sensor

Smallest Dinrail KWH Meter

Certificate:

Feature:
  • Voltage: 220V
  • Current: 10(60)A
  • Size:1P 18mm
  • Communication: RS485

Three-phase KWH Meter with MID

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Feature:
  • 3P3L & 3P4L
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective

Smart Lorawan Energy & Power Meter

Standard:

2014/30/EU

EN IEC 61000

IEC 62052

IEC 62053

Certificate:

Feature:
  • LORAWAN Wireless
  • Electric Parameter
  • Residual Current
  • Cable Temperature
  • 4DI/2DO

Three-phase Prepaid KWH Meter

Standard:

2014/35/EU

2014/30/EU

Certificate:

Feature:
  • High Accuracy 0.5S
  • Multi-Tariffs
  • Built-in Relay
  • Switch Control

Single phase KWH Meter with MID

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

 

Certificate:

Feature:
  • 1-Phase 2-Wire
  • Direct load 80A
  • Multi-Tariffs
  • Cost-effective

Din-rail Three-phase KWH Meter with CT

Certificate:

Feature:
  • Voltage: 3P3L, 3P4L
  • Current: 3×10(80)A; 3×1(6)A
  • Communication: RS485
  • Optional: Multi-tariff, DI/DO, Temperature

Multi Channels Dual Source Power Meter for Cell Phone Tower

Standard:

2014/30/EU

EN IEC 61000

2014/35/EU

EN 61010

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Split-core Current Transformer with RJ12 Interface
  • 4 Channels of Three-phase or 12 Channels of Single-phase
  • Communication RS485 Modbus-RTU
  • Identify Generator or Utility Power
    Top