Rectangular Split Hall Sensor for Cell Tower DC Energy Meter

AHKC-SB

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

  • Wide Measuring Range
  • High Overload
  • Good Linearity
  • Anti-interface

Highlight

What’s the Function of Acrel AHKC Series Rectangular Split Hall Sensor for Cell Tower DC Energy Meter?

Theory

  • Hall Effect

 Primary

  • AC or DC 0-20000A

Secondary

  • 5V/4V
  • 4~20mA

Application

  • Measuring end for Solar and Wind energy

Specification

What’s the Specification of Acrel AHKC Series Rectangular Split Hall Sensor for Cell Tower DC Energy Meter?

Photo
Specification AHKC-K AHKC-H AHKC-KA AHKC-HB
Inner Size 64*16 mm 82*32 mm 104*36 mm 132*52 mm
Input Current AC/DC 0~(400-2000) A AC/DC 0~(500-3000) A AC/DC 0~(500-5000) A AC/DC 0~(2000-20000) A
Output Signal 4-20mA, 0-20mA, 0-4V, 0-5V 0-4V, 0-5V 0-4V, 0-5V 4-20mA, 0-20mA, 0-4V, 0-5V
Auxiliary Power 12V/24V, ±15V ±15V ±15V 12V/24V, ±15V

Parameter

What’s the Parameter of Acrel AHKC Series Rectangular Split Hall Sensor for Cell Tower DC Energy Meter?

Accuracy 1.0 class
Linearity ≤0.2% FS
Bandwidth 0-20 KHz
Response Time ≤5 μs
Withstand AC3500V
Temperature -40℃~85℃
Altitude ≤2000 m
Humidity ≤95%

Installation

How to Install the Acrel AHKC Series Rectangular Split Hall Sensor for Cell Tower DC Energy Meter?

Request Information & Quotation

Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]

If you have more detailed requirements, Please go to the relevant product page to submit the form.

Why choose Acrel?

  • 2003 Established
  • SZ.300286 Listed Company
  • 1200+ People
  • 25000+㎡ Plant
  • Factory Direct-sale

FAQ

Got a Question? Get your Answer

What are the Main Advantages of Acrel?

We have our own Factory and R&D Center

What are the Difference between Acrel and other Brands?

Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer

What Certificates does the Company have?

CNAS, ISO14001, ISO27001, ISO9001

What Certificates do the Products have?

CE, IEC, MID, UL, EAC, ROHS, REACH

How Expensive is Acrel Products?

Competitive Price with High Quality

How long is the product Warranty Period?

2 Years

What is the MOQ?

Purchasing according to your needs, no MOQ limit

How long is the Lead Time?

Sample takes 3 days; Bulk purchase takes 1 month

AC 6 Three-phase or 18 Single-phase Multi Circuit Panle Meter for Cell Site

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Monitor: Grid, Generator, Air Conditioner, Lighting, etc
  • Active 2DI + Passive 4DI + 2DO
  • Up to 4 channels of Three-phase
  • or 12 channels of Single-phase
  • 2 NTC Temperature

Lead Acid Battery Management System for IDC UPS

Standard:

ANSI/TIA-942

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Battery Temperature
  • Battery Voltage
  • Battery Internal Resistance
  • Charge and Discharge current
  • Ambient Temperature

DC48V Auxi. Power DC Meter with 6 Citcuits

Standard:

EN 61326-1-2013

EN IEC 61000-3-2:2019+A1:2021

EN 61000-3-3:2013+A2:2021

IEC 61000-4-2; IEC 61000-4-3; IEC 61000-4-4; IEC 61000-4-5; IEC 61000-4-6; IEC 61000-4-8

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Rated -48V DC
  • 6 DC channels
  • Utility Monitor
  • Power for Hall Sensor

DC24V Auxi. Power RS485 Modbus-RTU AC Power Meter

Standard:

2014/30/EU

EN IEC 61000

IEC 62052

IEC 62053

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Wireless
  • 4 Tariffs
  • Temperature
  • Leakage Current

Two Channels DC Energy Meter

Standard:

2014/30/EU

2014/35/EU

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Dual DC Circuits
  • Secondary RS485
  • DC1000V
  • 5s Accuracy

Split Type Hall Current Sensor for Cell Tower DC Energy Meter

Standard:

IEC 61558-1

IEC 61558-2-15

IEC60364-7-710

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Capacity: 3.15, 5, 6.3, 8, 10 KVA
  • Noise Level: <40dB
  • Insulation Class: H
  • Short Circuit Voltage ≤ 3%
  • No-load Output Current ≤ 3%
  • Inrush Current ≤ 12 In
  • Leakage Current <0.2mA
  • Efficiency >96%

Multi Channels Dual Source Power Meter for Cell Phone Tower

Standard:

2014/30/EU

EN IEC 61000

2014/35/EU

EN 61010

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Split-core Current Transformer with RJ12 Interface
  • 4 Channels of Three-phase or 12 Channels of Single-phase
  • Communication RS485 Modbus-RTU
  • Identify Generator or Utility Power

DC12V Auxi. Power RS485 Modbus-RTU AC Energy Meter

Standard:

2014/30/EU

EN IEC 61000

IEC 62052

IEC 62053

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • DC12V /DC24V Power Supply
  • 4 Tariffs
  • Temperature
  • Leakage Current

DC 3 Channels Energy Meter for Mobile Phone Tower

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • AC or DC
  • 1 channel of Three-phase
  • 3 channels of Single-phase
  • 3 channels of DC

AC DC Energy Meter for Cell Site

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • AC or DC
  • 1 channel of Three-phase
  • 3 channels of Single-phase
  • 3 channels of DC

    Top